☀️ 82°Jacksonville, FLMonday, November 2, 2026
JACKSONVILLE WATCHNEWSJACKSONVILLE
OUR CITY.
OUR RIVER.
ALWAYS ON.
BREAKING NEWS
Jacksonville Watch News — Jacksonville's own newsroom, covering the city and the coast
Live weather for Jacksonville and Duval County
Send news tips to contact@jacksonville.twanews.com
›
I-95 SOUTHSIDE / WIDENING TO 10 LANES

More Lanes Coming to I-95 on the Southside: FDOT Says Construction Starts Soon on Widening From I-295 to Butler Boulevard to 10 Lanes

The Florida Department of Transportation says construction will start soon on widening I-95 from I-295 to Butler Boulevard, expanding the Southside's busiest stretch to 10 lanes - the latest in the interstate rebuild working its way across Jacksonville.

Jacksonville Watch News Jacksonville • Just now • I-95 SOUTHSIDE / WIDENING TO 10 LANES
More Lanes Coming to I-95 on the Southside: FDOT Says Construction Starts Soon on Widening From I-295 to Butler Boulevard to 10 Lanes (Jacksonville Watch News)

The Southside's stretch of I-95 is next. The Florida Department of Transportation says construction will start soon on widening I-95 from I-295 to J. Turner Butler Boulevard, and that the interstate will expand to 10 lanes between those two interchanges, First Coast News reported in a video file read by the desk this run, with the department's statement carried in the report's own description.

That segment is the hinge of the Southside commute: it carries traffic between the I-295 beltway's south interchange and the Butler Boulevard corridor that feeds the Southpoint and Deerwood office districts, the Town Center area, and the Beaches-bound flow that peels off at JTB. Ten lanes there follows the pattern FDOT has already built on the west side, where the I-10 widening from I-295 to I-95 rebuilt that interstate as a 10-lane divided roadway - a $176.6 million design-build project whose engineer-of-record record the desk read this run.

Downtown, the companion work continues in parallel: FDOT's I-95/I-10 interchange improvements, a $126 million federally financed project on budget in the trade-press account the desk read this run, widen the Fuller Warren Bridge to four lanes in each direction with a shared-use path and build a dedicated ramp meant to cut the weaving merge from I-95 southbound to I-10 westbound.

No lane-closure schedule for the Southside widening was published in the announcement the desk read, and the desk invents none: the AM drive file will carry closures and detours as FDOT District 2 posts them. What drivers have today is the announcement itself - the project is real, the limits are I-295 to Butler, the finished width is 10 lanes, and construction starts soon, in the department's words.

See an error in this story? Read our Corrections Policy or contact the newsroom.
MORE I-95 SOUTHSIDE / WIDENING TO 10 LANES →

More in I-95 southside / widening to 10 lanes